Employer: Armilla Suspension Systems
Tonnage: 35 tons
Scope of Work: Static analysis, structural modeling and fabrication, preparation of assembly drawings
Since it is a special architectural design, the analyses and modeling were performed in a way that would not compromise the architectural appearance. All connection details required for attaching the membrane covering were analyzed and incorporated into the structural model.