Tonnage: 50 tons
Scope of Work: Structural analysis, structural modeling and fabrication, preparation of assembly drawings
The parking structures, designed as modular systems, are engineered to be produced in the desired dimensions and quantities. All connections are designed with bolts to enable disassembly and relocation in the future.