Employer: Toltar Architecture
Status: Completed
Weight: 35 tons
Scope of Work: Structural analysis, structural modeling and fabrication, preparation of assembly drawings
The flooring of the structure, which will be used as a conference hall, has been designed as composite. Since welding cannot be performed during assembly, all details have been resolved using bolts.